No | Nama Peserta | K | A | T | ST | P | PT | HN | H | P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | CV. Prima Engineering Consultant - 02.760.344.8-307.000 | 72,53 | Rp. 198.000.000,00 |
Rp. 198.000.000,00 |
||||||||
2 | PT. CIPTA WIRA PERDANA - 01.443.084.7-307.000 | 81,27 | Rp. 198.616.000,00 |
Rp. 198.616.000,00 |
||||||||
3 | CV. GUNUNG KENCANA - 01.443.004.5-308.000 | |
|
|||||||||
4 | PT. Astadipati Duta Harindo - 03.310.350.8-311.000 | |
|
|||||||||
5 | CV.KINGSTOM TEKNITAMA - 02.535.020.8-822.000 | |
|
|||||||||
6 | CV.KINGSTOM TEKNITAMA - 02.535.020.8-822.000 | |
|
|||||||||
7 | PT. WANDRA CIPTA ENGINEERING CONSULTANT - 02.585.033.0-216.000 | |
|
- A Evaluasi Administrasi
- T Evaluasi Teknis
- ST Skor Teknis
- P Penawaran
- PT Penawaran Terkoreksi
- HN Hasil Negosiasi
- SH Skor Harga
- SA Skor Akhir
- K Evaluasi Kualifikasi
- SK Skor Kualifikasi
- SB Skor Pembuktian
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak