No | Nama Peserta | K | SK | A | T | ST | P | PT | HN | H | SH | SA | P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | PT. WANDRA CIPTA ENGINEERING CONSULTANT - 02.585.033.0-216.000 | 80,0 | 86,24 | Rp. 228.745.000,00 |
Rp. 259.242.500,00 Melebihi Nilai Total HPSMelebihi Pagu |
23,94 | 88,62 | ||||||||
2 | CV. LENEA Consultant - 01.547.528.8-307.000 | 56,16 | 88,92 | Rp. 248.215.000,00 |
Rp. 248.215.000,00 |
25,0 | 91,69 | ||||||||
3 | CV. GUNUNG KENCANA - 01.443.004.5-308.000 | 61,55 | 70,39 | Nilai teknis dibawah ambang lulus 75 | |||||||||||
4 | SELFIRA KONSULTAN - 01.892.765.7-306.000 | 50,77 | Tidak masuk daftar pendek | ||||||||||||
5 | CV. CIPTA GIRI MULYA - 01.780.587.0-307.000 | 53,47 | tidak memasukkan dokumen penawaran | ||||||||||||
6 | PT. CIPTA WIRA PERDANA - 01.443.084.7-307.000 | 54,28 | tidak memasukkan dokumen penawaran | ||||||||||||
7 | CV. MUSI REKAYASA DESAIN - 81.068.299.7-301.000 | 5,0 | Tidak masuk daftar pendek | ||||||||||||
8 | PT. BUANA REKAYASA ADHIGANA - 80.245.904.0-322.000 | 36,64 | Tidak masuk daftar pendek | ||||||||||||
9 | CV. Ariane Tama Consultant - 76.872.770.3-306.000 | ||||||||||||||
10 | PT. REZKY BIMA CIPKA KONSULTAN - 01.521.508.0-201.000 | ||||||||||||||
11 | CV.RADITYATAMA ENGINEERING KONSULTAN - 02.652.976.8-331.000 | ||||||||||||||
12 | CV. Tiga Saudara Kembar - 71.283.039.7-314.000 | ||||||||||||||
13 | RC CONSULTANT - 74.889.187.4-322.000 | ||||||||||||||
14 | CV. AZIMUTH - 72.384.988.1-307.000 | ||||||||||||||
15 | CV.ANDALAS CONSULINDO - 03.254.282.1-203.000 | ||||||||||||||
16 | cv. Hafilia - 02.063.273.3-301.000 | ||||||||||||||
17 | CV. Prima Engineering Consultant - 02.760.344.8-307.000 |
- A Evaluasi Administrasi
- T Evaluasi Teknis
- ST Skor Teknis
- P Penawaran
- PT Penawaran Terkoreksi
- HN Hasil Negosiasi
- SH Skor Harga
- SA Skor Akhir
- K Evaluasi Kualifikasi
- SK Skor Kualifikasi
- SB Skor Pembuktian
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak