No | Nama Peserta | K | SK | A | T | ST | P | PT | HN | H | SH | SA | P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | CV.MOHEM - 75.003.548.7-306.000 | 64,05 | 83,0 | Rp. 298.375.000,00 |
Rp. 298.375.000,00 |
100,0 | 86,4 | ||||||||
2 | PT. WANDRA CIPTA ENGINEERING CONSULTANT - 02.585.033.0-216.000 | ||||||||||||||
3 | CV. CIPTA GIRI MULYA - 01.780.587.0-307.000 | 69,17 | Tidak Memasukkan File Penawaran Teknis (File I) dan File Penawaran Biaya (File II) | ||||||||||||
4 | CV. GUNUNG KENCANA - 01.443.004.5-308.000 | 100,0 | 59,64 | Nilai Teknis kurang dari Ambang Lulus 65 | |||||||||||
5 | CV. LENEA Consultant - 01.547.528.8-307.000 | 64,29 | Tidak Memasukkan File Penawaran Teknis (File I) dan File Penawaran Biaya (File II) | ||||||||||||
6 | ARCH CONSULTANT ENGINEERING 4 - 01.598.581.5-307.000 | ||||||||||||||
7 | cv.alpha mekanika sarana - 02.760.426.3-307.000 | 62,86 | Tidak Memasukkan File Penawaran Teknis (File I) dan File Penawaran Biaya (File II) | ||||||||||||
8 | CV. PUTRA JAILANI - 74.231.559.1-314.000 | ||||||||||||||
9 | CV. BROYOT PALDAS - 02.894.230.8-314.000 | ||||||||||||||
10 | CV. NIYUR PRATAMA MANDIRI - 02.280.031.2-314.000 | ||||||||||||||
11 | CV.12 MARET - 71.646.316.1-307.000 | ||||||||||||||
12 | Tri Cipta - 01.780.290.1-308.000 | ||||||||||||||
13 | Cipta Mandiri Konsultan - 01.574.413.9-307.000 | ||||||||||||||
14 | CV. Dwipantara Mega Konsultan - 03.309.461.6-323.000 |
- A Evaluasi Administrasi
- T Evaluasi Teknis
- ST Skor Teknis
- P Penawaran
- PT Penawaran Terkoreksi
- HN Hasil Negosiasi
- SH Skor Harga
- SA Skor Akhir
- K Evaluasi Kualifikasi
- SK Skor Kualifikasi
- SB Skor Pembuktian
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak