No | Nama Peserta | K | SK | A | T | ST | P | PT | HN | H | SH | SA | P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | CV. Phitu Sima - 02.546.836.4-307.000 | 100,0 | 90,88 | Rp. 393.195.000,00 |
Rp. 393.195.000,00 |
100,0 | 92,7 | ||||||||
2 | CV. WAHYU JAYA PERSADA - 02.780.200.8-301.000 | 68,56 | 52,65 | Nilai teknis kurang dari Ambang Lulus 70 | |||||||||||
3 | CV. Studio Reka Teknik - 03.023.594.9-301.000 | 63,15 | Tidak Memasukkan File Penawaran Teknis (File I) dan File Penawaran Biaya (File II) | ||||||||||||
4 | PT. Ravino Citra Mandiri - 75.537.020.2-301.000 | SBU Perusahaan Kualifikasi Non Kecil | |||||||||||||
5 | SULTHONIA CONSULTAN - 02.797.623.2-306.000 | ||||||||||||||
6 | CV.DWI ENGINEERING CONSULTANTS - 03.349.694.4-307.000 | ||||||||||||||
7 | MUARA KONSULTAN - 73.147.898.8-307.000 | 37,88 | Tidak Memasukkan File Penawaran Teknis (File I) dan File Penawaran Biaya (File II) | ||||||||||||
8 | Swa Didri Teknik - 03.103.541.3-301.000 | 64,44 | 15,41 | Nilai teknis kurang dari Ambang Lulus 70 | |||||||||||
9 | CV.AGPELINDO PRIMA KONSULTAN - 03.070.120.5-307.000 | ||||||||||||||
10 | PT. Astadipati Duta Harindo - 03.310.350.8-311.000 | ||||||||||||||
11 | CV.LEMBAGA KONSULTANINDO - 03.300.987.9-307.000 | ||||||||||||||
12 | CV. TATA P'SETYA - 01.516.135.9-301.000 | ||||||||||||||
13 | PT. Citra Mandiri Bangun Persada - 02.779.856.0-301.000 |
- A Evaluasi Administrasi
- T Evaluasi Teknis
- ST Skor Teknis
- P Penawaran
- PT Penawaran Terkoreksi
- HN Hasil Negosiasi
- SH Skor Harga
- SA Skor Akhir
- K Evaluasi Kualifikasi
- SK Skor Kualifikasi
- SB Skor Pembuktian
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak