No | Nama Peserta | K | SK | A | T | ST | P | PT | HN | H | SH | SA | P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | CV. GUNUNG KENCANA - 01.443.004.5-308.000 | 100,0 | 87,36 | Rp. 248.484.000,00 |
Rp. 248.484.500,00 |
100,0 | 89,89 | ||||||||
2 | PT. WANDRA CIPTA ENGINEERING CONSULTANT - 02.585.033.0-216.000 | Tidak hadir Pembuktian Kualifikasi | |||||||||||||
3 | CV. MUSI REKAYASA DESAIN - 81.068.299.7-301.000 | ||||||||||||||
4 | CV. LENEA Consultant - 01.547.528.8-307.000 | 80,05 | 59,46 | Nilai Teknis kurang dari Ambang Lulus 65 | |||||||||||
5 | CV. CIPTA GIRI MULYA - 01.780.587.0-307.000 | 56,95 | Tidak Memasukkan File Penawaran Teknis (File I) dan File Penawaran Biaya (File II) | ||||||||||||
6 | SELFIRA KONSULTAN - 01.892.765.7-306.000 | 55,75 | Tidak Memasukkan File Penawaran Teknis (File I) dan File Penawaran Biaya (File II) | ||||||||||||
7 | CV. Phitu Sima - 02.546.836.4-307.000 | ||||||||||||||
8 | CV. PUTRA JAILANI - 74.231.559.1-314.000 | ||||||||||||||
9 | PT. MANUNGGAL DULANG MULTI KENCANA - 72.029.054.3-307.000 | ||||||||||||||
10 | CV. Prima Engineering Consultant - 02.760.344.8-307.000 | ||||||||||||||
11 | CV. HABINUBI - 73.179.293.3-306.000 | ||||||||||||||
12 | CV. BROYOT PALDAS - 02.894.230.8-314.000 | ||||||||||||||
13 | CV. NIYUR PRATAMA MANDIRI - 02.280.031.2-314.000 | ||||||||||||||
14 | CV.12 MARET - 71.646.316.1-307.000 | ||||||||||||||
15 | PT. CIPTA WIRA PERDANA - 01.443.084.7-307.000 |
- A Evaluasi Administrasi
- T Evaluasi Teknis
- ST Skor Teknis
- P Penawaran
- PT Penawaran Terkoreksi
- HN Hasil Negosiasi
- SH Skor Harga
- SA Skor Akhir
- K Evaluasi Kualifikasi
- SK Skor Kualifikasi
- SB Skor Pembuktian
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak